Unincorporated Osceola County: driveway permits, the 24-foot rule and flatwork

Published 2026-09-11 · By the Kissimmee Concrete team

Unincorporated Osceola County

Do you need a permit for a driveway in unincorporated Osceola County?

Yes. Osceola County Code of Ordinances §22-50.6 (Ordinance 12-10, §6, effective March 19, 2012) reads: '(a) Residential driveways shall not exceed twenty-four (24) feet in width unless approved by conditional use. (b) Residential driveway construction or widening shall be authorized by the issuance of a driveway permit by Osceola County.' Right-of-way work follows Land Development Code section 4.12.2, which applicants must attest to having read.

Facts from the Building Office, quoted

Building Office: 1 Courthouse Square, Suite 1400, Kissimmee, FL 34741 · 407-742-0200 · permits.osceola.org.
QuestionAnswer (Building Office Frequent Questions)
Which code?The 8th edition (2023) Florida Building Code and 2020 NEC, effective December 31, 2023; the county does not enforce local amendments to the building code
Who can apply?'Any owner, licensed contractor or authorized agent may bring in the permit application' but only the applicant (owner or contractor) may sign; signatures not given in person must be notarized
Notice of Commencement?Required for projects valued at $5,000 or more; notarized, recorded at the County Courthouse (2 Courthouse Square, 2nd floor), copy to the Permitting Office or NOC@Osceola.org before the jobsite inspection
Residential plan review time'Normally takes 3 to 5 days' if documents meet code; deficiencies bring correction requests
InspectionsScheduled online, by text or phone; call before 3:00 p.m. for next-day; Saturday inspections requested by 3:00 p.m. Thursday; after-hours minimum $160
Owner-builderAllowed for 1–2 family homes with a signed Owner-Builder Statement/Affidavit submitted in person
FeesPer the current adopted County Fee Schedule (Appendix B, Community Development Fees)
Contractor registrationRegister with the State (DBPR) first, then with the county's Licensing page (applies to licensed categories; flatwork and pavers are not licensed categories)

What falls under which permit

Driveways. New, replaced or widened: county driveway permit; 24 feet maximum. Pavers in the driveway are covered by the same permit; the apron in the right-of-way follows the county detail. Patios, pads, pool-deck overlays. A detached slab outside the setbacks is generally flatwork without a building permit; a slab within a setback, attached to the house, under a roof, tied to a pool or screen enclosure, or in a flood zone should be confirmed with the Building Office, and HB 803's written-request exemption applies under $7,500 since July 1, 2026. Sheds. The county publishes 'Permit Requirements for Storage Sheds'; the shed is the permitted structure and the pad is inspected with it. Repairs, resurfacing, sealing. Maintenance, no permit. We confirm the category for your address before we quote and put it in writing.

The ordinance

Section 22-50.6 in full, and what it means

The county's paving and driveway restriction reads, in the version published in the Code of Ordinances: residential driveways shall not exceed twenty-four feet in width unless approved by conditional use, and residential driveway construction or widening shall be authorised by the issuance of a driveway permit by Osceola County.

Two things follow. First, twenty-four feet is a hard cap for a residential driveway in the unincorporated county without going through a conditional use process, which is a planning application rather than a building one and is not a routine step. Second, the permit requirement attaches to construction or widening, so a replacement in the same footprint still needs the permit because the apron sits in the right-of-way. Applicants are also asked to attest that they have read Land Development Code section 4.12.2, which governs right-of-way work.

Facts from the Building Office worth knowing before you apply

From the Building Office's published frequent questions and permit information, checked on 2026-09-10.
ItemWhat the office publishes
Code in forceThe 2023, eighth edition Florida Building Code with the 2020 NEC, effective from 31 December 2023
Residential plan reviewNormally three to five days
Notice of commencementRequired on jobs of $5,000 and above, recorded before the first inspection
Inspection schedulingRequested before 3 p.m. for the following day
Saturday inspectionsBy request made by Thursday at 3 p.m.
After-hours inspection feeA minimum charge applies
Where1 Courthouse Square, Suite 1400, Kissimmee, on 407-742-0200
PortalThe county's Accela-based permit centre

Questions we get about this

How wide can my driveway be?

24 feet unless a conditional use is approved (§22-50.6(a)).

Do I need a permit to widen my driveway?

Yes; construction or widening requires a county driveway permit (§22-50.6(b)).

How long does the permit take?

Residential plan review normally 3 to 5 days once the application is complete.

What is a Notice of Commencement?

A recorded notice required for jobs of $5,000 or more before the first inspection; we prepare it, you sign before a notary, and it is recorded at the courthouse.

Does a backyard patio need a permit?

A detached slab outside setbacks is generally flatwork; attached, roofed, in-setback or flood-zone slabs are permitted. HB 803's $7,500 exemption needs a written request.

Get a written estimate for your project

Tell us the size, the surface you have now and where the lot is. We visit, measure, check access and drainage, and send a written proposal. No pressure calls.

What changed in this update: 2026-09-11 — first published

Free estimate