A concrete pad runs $9.00–$15.00 per sq ft installed in the Q3 2026 Cost Index; a 10-by-12 shed pad typically lands at $1,200 to $1,900 and a 12-by-40 RV pad at 6 inches with rebar at $6,500 to $9,500. Thickness follows the load: 4 inches for sheds and AC units, 5 under a hot tub, 6 with a #4 grid for RVs, boats and workshop equipment.
Pads we pour, and the spec for each
| Pad | Typical size | Thickness / mix | Steel | Notes |
|---|---|---|---|---|
| Storage shed | 8×10 to 12×20 | 4 in, 3,000 psi | Fiber; #4 at edges | Osceola has published shed permit requirements; anchoring is the shed installer's scope |
| AC condenser | 3×3 to 4×4 | 4 in, 3,000 psi | Fiber | Raised 2–4 in above grade so the unit stays out of standing water |
| Standby generator | 4×8 to 5×10 | 4 in, 3,000 psi | #4 grid | Manufacturer clearances from the house govern location; electrical and gas are licensed trades |
| Hot tub / swim spa | 8×8 to 10×16 | 5 in, 3,500 psi | #4 grid @ 12 in | A filled 8-person spa weighs about 6,000 lb; level within ¼ in |
| RV / boat pad | 12×40 to 14×50 | 6 in, 4,000 psi | #4 grid @ 18 in on chairs | Turning radius and hitch swing checked on site; county driveway permit if it connects to the street |
| Workshop / metal building | 24×30 and up | 6 in, 4,000 psi, thickened edge | #4 grid; edge footing per building supplier | Anchor bolt layout from the building supplier; permit as an accessory structure |
| Dumpster / equipment pad (commercial) | 10×12 to 12×20 | 6–8 in, 4,000 psi | #4 or #5 grid | See commercial concrete |
Base, elevation and the water table
The one rule for a pad on Osceola's flatwoods sand: keep it above the water. Smyrna and Myakka fine sands hold a wet-season water table about 12 inches down, and a pad set flush with the lawn will have wet feet every June. We build pads 2 to 4 inches above finished grade on 4 inches of compacted limerock, with the top sloped ¼ inch per foot so rain runs off, and we pull the pad away from downspouts. On the Polk County ridge (Davenport, Haines City, Lake Wales) the soil is Candler sand, deep and dry, and the issue is compaction of a base that will not densify unless it is wetted first; see Paver Base on Flatwoods Sand vs. Ridge Sand: Osceola and Polk Are Not the Same.
Rural St. Cloud, Harmony and Kenansville lots often have a septic system. A pad or driveway over a drainfield compacts the soil, blocks evaporation and can crush the pipe; we locate the tank and drainfield from the county record and keep the pad off them: Septic Drainfields and Driveways on Rural St. Cloud and Harmony Lots.
Do I need a permit for a concrete pad in Osceola or Polk County?
It depends on what sits on it. In Polk County, slabs adjacent to or intended to support a structure, elevated slabs, and slabs within the minimum setbacks require a permit; a free-standing pad outside setbacks does not. Osceola publishes shed permit requirements and treats the shed, not the pad, as the permitted structure. Generator and AC pads are usually inspected under the electrical or mechanical permit for the equipment. HB 803's $7,500 exemption (July 1, 2026) can cover a stand-alone pad with a written request.
We confirm with the office for your address and put it in the proposal. Sources and office contacts: Unincorporated Osceola County, Polk County (unincorporated), City of Kissimmee, City of St. Cloud. HOA rules are stricter than permits for sheds: APV Poinciana requires sheds on a concrete pad, no taller than 8 feet, colored to match the house, and prohibits them entirely in Cypress Woods; see Association of Poinciana Villages (APV).
Pad costs (Q3 2026)
| Item | Unit | Low | High | Notes |
|---|---|---|---|---|
| Concrete driveway, 6 in, 4,000 psi with #4 rebar grid (RV/boat loads) | sq ft | $11.50 | $17.00 | Thicker slab, more steel, same forming and finishing labor |
| Concrete patio, 4 in, broom or smooth | sq ft | $8.00 | $12.50 | Small pours cost more per foot; under 200 sq ft expect the top of the range |
| Concrete pad (shed, AC, generator, hot tub), 4 in | sq ft | $9.00 | $15.00 | Minimum-charge jobs; a 10x12 pad typically lands at $1,200–$1,900 |
| Ready-mix concrete, 3,000–4,000 psi, delivered (Orlando market) | cu yd | $175 | $280 | Supplier public price lists, Sept 2026; short-load and fuel surcharges extra |
Small pads carry a minimum charge because the ready-mix short-load fee and the crew's half day are fixed. Combining a shed pad with a walkway or AC pad in one visit saves 20 to 30 percent versus two trips. Size the pad yourself with the Concrete & Paver Calculator: it converts length, width and thickness into cubic yards and bags and applies the current index range.
Where this service changes by city
The Kissimmee page above is the master; these pages cover what changes by city: soil unit, permit office, HOA and the age of the houses.
How much concrete a pad actually takes
| Pad | Size | Thickness | Cubic yards | Ready-mix cost at $175 to $280/yd |
|---|---|---|---|---|
| AC or generator pad | 4 by 8 ft | 4 in | 0.4 | $70 to $112, subject to a short-load fee |
| Shed pad | 10 by 12 ft | 4 in | 1.5 | $263 to $420 |
| Hot tub pad | 8 by 10 ft | 5 in | 1.3 | $228 to $364 |
| Boat pad | 10 by 30 ft | 6 in | 5.6 | $980 to $1,568 |
| RV pad | 12 by 40 ft | 6 in | 8.9 | $1,558 to $2,492 |
| Workshop slab | 30 by 40 ft | 6 in | 22.2 | $3,885 to $6,216 |
What sits on the pad decides what goes in it
The load on a pad is almost never spread evenly, and that is what people get wrong when they size one. A travel trailer puts most of its weight on four jack feet, each one a few square inches. A hot tub full of water and eight people is around six thousand pounds on a footprint that is mostly empty in the middle. A metal building puts its whole load into the anchor bolts at the column lines. A generator concentrates its weight on a frame that is narrower than the pad.
So we ask what is going on it, and then we design for that: a grid rather than fibre alone under point loads, five inches rather than four under a spa, a thickened edge where a building's columns land, and six inches with a grid under anything on jack feet. The pad that fails is almost always the one that was sized by area and thickness without anyone asking what would stand on it.
Questions we get about this
How thick should a shed pad be?
Four inches of 3,000 psi concrete with fiber for a storage shed, set 2 to 4 inches above grade on a compacted base. Go to 5 inches with a rebar grid if the shed will hold a riding mower, a lift or heavy shelving.
How thick should an RV pad be?
Six inches of 4,000 psi with a #4 rebar grid at 18 inches on chairs. A 12-by-40 pad uses about 9 cubic yards. If it connects to the street it also needs the county or city driveway permit.
Do I need a permit for a shed slab in Osceola County?
The county permits the shed as an accessory structure and publishes the requirements; the slab is inspected with it. A pad with nothing on it outside the setbacks is generally not permitted separately, and HB 803's $7,500 exemption may apply with a written request. We confirm with the office before quoting.
Can you pour a pad over my septic drainfield?
No, and neither should anyone else. We locate the tank and drainfield from the county record and keep the pad clear.
How level does a hot tub pad need to be?
Within ¼ inch across the pad. We pour 5 inches with a grid, then check with a laser before it sets.
How many cubic yards is a 12 by 40 RV pad?
About 8.9 yards at six inches. At current Orlando-market ready-mix prices that is roughly $1,560 to $2,490 in material before base, steel, forming and labour.