Pour Calendar: rain days and temperatures for Kissimmee

Published 2026-09-11 · By the Kissimmee Concrete team

Pour Calendar · NOAA 1991–2020

When to pour, sand and seal in Kissimmee

NOAA's 1991–2020 normals for the Kissimmee 2 station (USC00084625): June averages 15.8 days with measurable rain, July 16.7, August 17.7 and September 14.3, with 12 or 13 of those days over a tenth of an inch. October through April run 6 to 9. Highs peak at 91.5 °F in July. Our rule: months with 12 or more tenth-inch days are storm-season months, pours start at first light and finish before 2 p.m., and polymeric sand and sealers wait for a dry 24-hour window.

Jan72° / 48°
7.6 rain days
2.7 in
Feb74° / 51°
6.5 rain days
2.4 in
Mar78° / 54°
6.2 rain days
3.1 in
Apr83° / 60°
5.7 rain days
2.4 in
May87° / 66°
7.8 rain days
4.2 in
Jun90° / 72°
15.8 rain days
9.2 in
Jul92° / 74°
16.7 rain days
7.2 in
Aug91° / 74°
17.7 rain days
8.4 in
Sep90° / 73°
14.3 rain days
5.9 in
Oct85° / 66°
8.7 rain days
3.1 in
Nov79° / 57°
5.8 rain days
2.0 in
Dec74° / 52°
6.5 rain days
2.1 in

Bars: days with ≥ 0.01 in of rain (scale to 18). Orange border: storm-season month (≥ 9 days over 0.10 in). Green border: driest months. Source: NOAA NCEI U.S. Climate Normals 1991–2020, Kissimmee 2, FL.

The full table

NOAA NCEI U.S. Climate Normals 1991–2020, station USC00084625, Kissimmee 2, FL (28.2764 N, 81.4239 W). Orlando International (USW00012815) is within a day or two of these figures every month.
MonthAvg high °FAvg low °FRain (in)Days ≥ 0.01 inDays ≥ 0.10 in
Jan71.848.32.677.64.1
Feb74.450.72.376.54.0
Mar77.954.43.076.24.2
Apr83.059.72.435.73.6
May87.465.84.177.85.7
Jun90.071.89.1815.812.3
Jul91.573.57.2116.712.2
Aug91.474.18.3817.713.0
Sep89.572.85.8814.39.5
Oct84.666.23.078.75.7
Nov78.657.31.995.83.1
Dec73.551.52.156.53.5

Pouring Concrete in the Rainy Season: How We Schedule Around Afternoon Storms; Curing Concrete in Central Florida Heat: 7 Days, 28 Days and What Happens In Between.

Method

Reading the calendar

The calendar is built from the NOAA 1991 to 2020 normals for the Kissimmee 2 station, and the number that drives our recommendation is days with at least a tenth of an inch of rain rather than total rainfall. A month with nine inches spread over thirteen wet days is harder to schedule around than a month with four inches on six days, and the totals alone hide that.

Months with twelve or more such days, June through August with September close behind, are treated as storm-season months: first-light starts, slab finished and covered before the early afternoon, base work not left open overnight when a system is forecast. October through April, at roughly three to six such days a month, are ordinary scheduling.

What the calendar cannot do

It cannot forecast. Normals are thirty-year averages and tell you what a typical August looks like, not what next Tuesday will. The working forecast we actually use is the morning radar and the hour-by-hour outlook on the day, and the decision to pour or postpone is made that morning rather than a week out.

It also does not capture the other seasonal constraint, which is demand. Google Trends for the Orlando market shows paver interest peaking in April and May every year for the past five years, and pool deck interest with it. That is a scheduling constraint of a different kind: the weather in March is excellent and the calendar is full. Booking in the autumn for spring work is the practical response.

Questions we get about this

What is the best month to pour a driveway in Kissimmee?

November through April on rain days alone; May is the busiest month for demand. Summer pours work with first-light starts.

Can you pour concrete in the rain?

Not in it. We pour before the afternoon storms and cover the slab; a wetted surface after finishing is fine, a downpour during finishing is not.

Why do polymeric sand and sealer need a dry day?

Both cure by drying; rain within 24 hours washes sand out of the joints or clouds a film sealer.

Where do the numbers come from?

NOAA's 1991–2020 monthly normals for the Kissimmee 2 station, downloaded September 10, 2026.

Get a written estimate for your project

Tell us the size, the surface you have now and where the lot is. We visit, measure, check access and drainage, and send a written proposal. No pressure calls.

What changed in this update: 2026-09-11 — first published

Free estimate