Bellalago and Isles of Bellalago: architectural review

Published 2026-09-11 · By the Kissimmee Concrete team

Bellalago & Isles of Bellalago

Bellalago's architectural review process

From bellalagohoa.com: 'Prior to any changes to the exterior of your home, an Architectural Review is needed.' Requests are submitted through the online ARC Request Form on the ConnectResident portal (house number and ZIP to start), the review committee convenes twice monthly, and written notification of the decision follows. The Bellalago & Isles of Bellalago Community Association is professionally managed by FirstService Residential; 24-hour resident line (866) 378-1099. The association has announced updated architectural guidelines covering modern materials and technologies.

What we verified and what we did not

Verified: the requirement of review before any exterior change, the online form and portal, the twice-monthly meeting cadence, the management company. Not verified: the specific criteria for driveway width, paver colors, pool-deck materials and fees, which are in the guidelines PDF available to residents. Bring the current document to the site visit and we build the packet to it. Bellalago is unincorporated Osceola County: driveway permit and 24-foot rule for new or widened drives (Unincorporated Osceola County); pool-deck overlays and patios outside setbacks are flatwork.

Typical Bellalago jobs

Travertine and marble pool decks inside screened lanais, paver driveway upgrades in the estate sections, paver and concrete repairs on 2005–2015 builder work, and sealing. The community sits on Smyrna and Myakka fine sand with lakefront lots on Lake Toho's wetter margins; drainage is designed into every deck (Kissimmee, Paver Pool Decks, Travertine). Packet: HOA / ARC Packet Checklist.

Process

How the review runs

Bellalago and Isles of Bellalago are managed by FirstService Residential, and architectural review is required before changes to the exterior of a home. Applications are submitted through the resident portal, and the committee meets approximately twice a month, which makes the turnaround shorter than in communities that meet monthly. A twenty-four hour resident line is available on 866-378-1099 for questions about the process.

Because the meeting cycle is comparatively quick, the realistic timeline for a Bellalago project is usually set by material lead time rather than by the association. That is worth knowing when planning a job around a season: a special-order travertine or a discontinued paver match will take longer than the approval will.

What we prepare for a Bellalago submission

A marked-up site plan or survey showing the existing surface and the proposed footprint with dimensions. The product name, manufacturer, colour and size, with a physical sample where pavers or stone are involved and a colour chip where concrete colour is. A pattern and border layout. A note on drainage saying where water currently goes and where it will go after the work. Our certificate of insurance. And photographs of the existing condition from the street and from the rear, because the committee is comparing against what is there now.

That packet is assembled by the packet checklist tool, which produces it as a single printable page. On lakefront and waterway lots we also include the elevation note, because raising a deck or a drive on those lots changes where runoff goes and the committee reasonably asks about it.

Waterfront lots

Lakefront and waterway lots

A good share of Bellalago and Isles of Bellalago backs onto water, and on those lots two extra questions apply to any hardscape project. Where does the additional runoff go, since a new deck or a widened drive sends more water toward the same low point. And does the work sit within any conservation or drainage easement recorded on the plat.

We include the elevation and drainage note in the architectural submission for waterfront lots as a matter of course, because the committee reasonably asks about it and answering in advance avoids a round trip. Where a project would materially change where runoff goes, we design the alternative route as part of the same application rather than treating it as a later fix.

Questions we get about this

How do I submit an ARC request in Bellalago?

Through the online ARC Request Form on the ConnectResident portal; the committee meets twice a month.

Do I need approval to reseal pavers?

A like-for-like clear seal is usually maintenance; confirm with FirstService if the finish changes.

Which county permits Bellalago?

Unincorporated Osceola County.

Where are the written criteria?

In the association's guidelines available to residents; we build to the current version you provide.

Get a written estimate for your project

Tell us the size, the surface you have now and where the lot is. We visit, measure, check access and drainage, and send a written proposal. No pressure calls.

What changed in this update: 2026-09-11 — first published

Free estimate