City of Kissimmee: driveway and sidewalk permits

Published 2026-09-11 · By the Kissimmee Concrete team

City of Kissimmee

Driveway and sidewalk permits inside Kissimmee city limits

Residents and property owners requesting updates to existing roads for driveway access or sidewalk construction within City of Kissimmee limits apply online through the City's EnerGov portal, selecting 'Driveway / Sidewalk Construction' as the request type. Plan review takes at least two business days after submission; the permit is issued at least two business days after the fee is paid. Any work within the right-of-way needs Public Works & Engineering approval.

The process, step by step

  1. Confirm the address is inside city limits and not on a county or FDOT right-of-way (the city's own first step). The finder below checks the city boundary.
  2. We open the application on the EnerGov Citizen Self Service portal, select 'Driveway / Sidewalk Construction', enter the address, specify driveway access, sidewalk or both, attach a photo and a site sketch.
  3. City staff follow up with the document list for the scope ('the City requires different documents depending on the work being done'); we supply them.
  4. Plan review: allow at least 2 business days.
  5. Fee communicated by email after approval, paid through the permit lookup tool; permit issued at least 2 business days after payment.
  6. Work, inspections, closeout; you get the permit number.

Contacts: Engineering Division, 101 Church Street, 3rd Floor, Kissimmee, FL 34741 · 407-518-2278 · engineering@kissimmee.gov. Building Division (patios, slabs, structures): permitting@kissimmee.org · 407-518-2379. Public Works & Engineering (right-of-way): 407-518-2169. Portal: EnerGov Citizen Self Service.

What we could and could not verify

Verified on kissimmee.gov: the application type, the review and issuance timelines, the right-of-way rule, the fee process and the contacts. Not verified: a published maximum residential driveway width for the city (the Land Development Code is rendered on Municode and was not readable in our check), and a published flatwork exemption list for detached patio slabs. For those two we call the Engineering or Building Division for your address and put the answer in the proposal. Outside the city line, Osceola County's §22-50.6 applies (Unincorporated Osceola County).

Where the city line runs

City: downtown and the Lake Tohopekaliga lakefront, the Vine Street (US-192) corridor, the John Young Parkway and Osceola Parkway annexations, Kissimmee Bay, Remington, and most of the newer commercial corridors. County: Buenaventura Lakes, Bellalago, the Pleasant Hill Road corridor, Poinciana, Celebration, Harmony, Narcoossee, Reunion, ChampionsGate. The Permit & Jurisdiction Finder checks any address; Kissimmee has the neighborhood table.

Process

What the application actually involves

The city's Driveway and Sidewalk Construction application is submitted through the EnerGov Citizen Self Service portal rather than on paper. What goes with it is a site plan showing the existing and proposed driveway with dimensions, the property lines and the right-of-way, details of the apron and any sidewalk crossing, and the contractor's information. Plan review takes at least two business days, and once the fee is paid the permit issues at least two business days after that, so a realistic minimum from submission to permit in hand is about a week.

Work in the right-of-way needs Public Works and Engineering approval alongside the building side, which is why the Engineering Division on the third floor at 101 Church Street on 407-518-2278 is the contact for driveway questions rather than the building counter. General permitting questions go to permitting@kissimmee.org or 407-518-2379.

The city line is not where people think it is

Kissimmee's boundary has grown by annexation along John Young Parkway, Osceola Parkway and the 192 corridor, leaving unincorporated pockets inside what looks like the city and large residential areas with Kissimmee addresses that are entirely county. Buenaventura Lakes is county. Most of the Pleasant Hill Road corridor is county. Parts of streets are split.

Because filing with the wrong office means starting again rather than being redirected, we resolve the parcel before preparing anything. The permit finder does it from an address against the Census city boundary, and for anything within a few hundred feet of the line we call the office rather than trusting the polygon.

Questions we get about this

How long does a Kissimmee driveway permit take?

At least 2 business days for plan review and at least 2 business days to issue after the fee is paid, per the city's page; allow a week with document requests.

Do I need a permit to replace my driveway in Kissimmee?

Yes, through the Driveway / Sidewalk Construction application, because the driveway connects to the city's right-of-way.

What about a patio?

The Building Division reviews by scope; a detached slab outside setbacks is often flatwork, and HB 803's $7,500 exemption may apply. We confirm for your address.

What if my street is a county road?

Then the application goes to Osceola County, not the city, even inside the city; the city's page tells applicants to confirm the right-of-way is the city's.

Get a written estimate for your project

Tell us the size, the surface you have now and where the lot is. We visit, measure, check access and drainage, and send a written proposal. No pressure calls.

What changed in this update: 2026-09-11 — first published