City of St. Cloud: which outdoor concrete and paver projects need a permit

Published 2026-09-11 · By the Kissimmee Concrete team

City of St. Cloud

St. Cloud's permit list for outdoor concrete and pavers

The City of St. Cloud's Permit Information page lists patios, decks, screen enclosures, sheds, gazebos, carports, reroofs, windows and solar among projects that require a permit, and lists 'driveway reseal for single-family/duplex (existing asphalt only, no striping)' and 'pavers for driveways/sidewalks (refer to Public Works)' among projects that do not need a building permit. Any work in the right-of-way needs Public Works and Engineering approval. The Building Department stopped accepting cash on January 1, 2025.

What this means by project

Building Department, 1300 9th Street, St. Cloud, FL 34769 · 407-957-7300 · portal: St. Cloud Building Permit Portal.
ProjectSt. Cloud positionWhat we do
Concrete driveway, new or replacedBuilding Department review; right-of-way portion via Public WorksFile with the Building Department; Public Works approval for the apron
Paver driveway or sidewalk'Refer to Public Works' (no building permit)Public Works approval; concrete apron to the city detail
Asphalt reseal (existing)No permitNot our scope
Patio slab, deckPermit required (on the list)File; HB 803 written-request exemption under $7,500 where the scope qualifies
Screen enclosure, shed, gazeboPermit requiredThe enclosure contractor permits it; our slab is inspected with it
Pool deck overlayDecks on the list; confirm whether an overlay is treated as maintenanceCall the Building Department for the address
Repair, resurfacing, sealingMaintenanceNo permit

HB 803 in St. Cloud

St. Cloud adopted the state's exemption for residential projects valued under $7,500 effective July 1, 2026, with the state's exclusions (structural, electrical, plumbing, mechanical, gas, FEMA special flood hazard areas) and a written exemption request. A detached patio slab under that value can qualify; a driveway in the right-of-way cannot. Florida's $7,500 Permit Exemption (HB 803) and Small Concrete Jobs.

Outside the city line

The Narcoossee communities, Harmony and the rural lots east and south straddle the line; some Sunbridge phases carry St. Cloud addresses while sitting in unincorporated Osceola, where §22-50.6 and the county driveway permit apply. The Permit & Jurisdiction Finder checks the boundary; Unincorporated Osceola County; St. Cloud; Harmony & Narcoossee.

The lists

The city's own lists, quoted

From the City of St. Cloud's published permit information, checked on 2026-09-10. Anything in the right-of-way needs Public Works and Engineering approval regardless of which column it falls in.
Needs a permitDoes not need a permit
PatiosDriveway reseal for single family or duplex, existing asphalt only
DecksPavers for driveways and sidewalks, referred to Public Works
Screen enclosuresInterior painting
RoofingCarpet and flooring
Windows and doorsCabinets
Sheds and accessory structuresLike-for-like repairs in the same footprint
Solar

Payments, portal and the new exemption

St. Cloud moved to cashless payment for permits from the first of January 2025, so fees are paid through the portal or by card at the counter rather than in cash. Applications go through the city's permit portal, and the Building Department is at 1300 9th Street on 407-957-7300.

The city has also taken up the state's exemption for single-family work valued under seven thousand five hundred dollars, effective the first of July 2026. It requires a written request for exemption rather than applying automatically, and it does not extend to structural, electrical, plumbing, mechanical or gas work, or to property in a FEMA special flood hazard area. For flatwork that means a qualifying stand-alone patio or pad may be exempted, while a driveway touching the right-of-way still goes through the normal route.

Questions we get about this

Do driveway pavers need a permit in St. Cloud?

Not a building permit: the city's list refers driveway and sidewalk pavers to Public Works, and the right-of-way portion needs Public Works approval.

Do patios need a permit in St. Cloud?

Yes; patios and decks are on the city's permit-required list. HB 803's $7,500 exemption may apply with a written request.

Can I pay the permit fee in cash?

No; the Building Department has been cashless since January 1, 2025.

Is my Narcoossee address in the city?

The finder checks the boundary; when an address is near the line we call the Building Department before filing.

Get a written estimate for your project

Tell us the size, the surface you have now and where the lot is. We visit, measure, check access and drainage, and send a written proposal. No pressure calls.

What changed in this update: 2026-09-11 — first published

Free estimate